Development Finance Calculator
How a development loan is sized from the end value, with the arithmetic shown
We do not have a development finance calculator on this page yet. We are building one, and until it is ready this page shows the sum a lender does by hand. A development loan is sized from the gross development value of the finished scheme, the price of the site, the cost of the build, a contingency, the interest that rolls up over the term and the lender’s fees. The lenders we work with will typically fund up to 60% of the land or property purchase and up to 100% of the build costs, with the whole facility capped at a share of the end value. Below is the arithmetic on a four-house scheme.
Where the numbers come from
Gross development value, or GDV, is what the finished units will sell for, taken from a valuer’s report rather than your own hopes for the scheme. A lender sets a ceiling for the whole facility, interest and fees included, as a percentage of GDV, and on a ground-up scheme that is often around 70% of the end value. The product itself is explained on our development finance page.
Underneath that ceiling the loan is built in two parts. The first tranche goes towards the site, and lenders will usually fund up to 60% of the purchase price, so you find the rest yourself. The second tranche pays for the works and can be up to 100% of the build cost. It is released in stages as the build progresses rather than on day one: a monitoring surveyor appointed by the lender visits, confirms what has been done and signs off each release. Interest is normally rolled up rather than paid monthly, so it is itself part of the loan and eats into the ceiling, and the arrangement fee is usually added too.
A worked example: four houses on a plot with planning
This is an example, not a client. Suppose you have found a plot with planning for four three-bedroom houses. The valuer expects each to sell for £300,000, so the GDV is £1,200,000. The plot costs £300,000 and your builder has priced the works at £520,000. The lender wants a 10% contingency in the appraisal, £52,000, and will include it in the facility so the money is there if you need it. The term is twelve months and the rate is 1% a month, rolled up. That rate is illustrative. What sets the rate on a real scheme is covered on our development finance rates page.
| Line | Sum | Amount |
|---|---|---|
| Site purchase, lender’s share | 60% of £300,000 | £180,000 |
| Build cost | 100% of £520,000 | £520,000 |
| Contingency | 10% of the build cost | £52,000 |
| Interest on the site tranche | £180,000 x 1% x 12 months | £21,600 |
| Interest on the build tranche | average balance of £286,000 x 1% x 12 months | £34,320 |
| Arrangement fee | 2% of £752,000 (illustrative) | £15,040 |
| Total facility | £822,960 |
Because the build money, contingency included, is drawn in stages, you do not pay interest on all of it from the start. Drawn evenly over twelve months, about half of the £572,000 is outstanding on average, £286,000, and that is the balance the interest is worked on. Most lenders charge interest only on what has been drawn, so an early finish, or a contingency you never touch, saves you money.
The total facility of £822,960 is 68.6% of the £1,200,000 GDV, under a 70% ceiling, so the scheme fits. Your own money goes on the balance of the site, £120,000, plus the valuation, legal and monitoring costs, the stamp duty on the plot and our fee, which we tell you before you commit. Allow about £12,000 for the valuation, legal and monitoring costs and the scheme returns around £245,000 before stamp duty on the plot, our fee, selling costs and tax. Every line you pay is set out on our development finance costs page.
What changes the answer
Move any one input and the facility moves with it. A lower GDV tightens the ceiling fastest: knock £20,000 off each house and the same facility is 73.5% of the end value, and the lender will ask for more of your own money in. A longer term adds a month of rolled-up interest. A site without planning is treated as a land purchase until consent is granted, and our development finance lenders page covers who will look at it in that state. And where a lender offers “100% development finance”, it means 100% of the build cost, never 100% of everything. The site deposit comes from you, or from a joint venture partner.
If your scheme is a light refurbishment that will be finished in a few months, development finance is the wrong tool. A refurbishment bridging loan will be cheaper and quicker, and we will say so.
Questions people ask about development finance calculators
How does development finance work?
A lender agrees a facility against the finished value of the scheme, releases a first tranche towards the site and then pays for the works in stages as a monitoring surveyor confirms progress. Interest rolls up and is paid, with the loan, when the units sell or are refinanced. Terms are usually 3 to 24 months; some lenders will go to 36.
How much deposit do I need for development finance?
Plan on 30 to 40% of the site price, because lenders fund up to 60% of it, plus the valuation, legal and monitoring costs. Some lenders will take equity in another property in place of part of the cash.
Can I get 100% development finance?
Up to 100% of the build cost, yes, from the lenders who work that way. The site still needs your money or a partner’s equity behind it.
What is the smallest development loan you arrange?
Development facilities run from £100,000 through to £150m and above. At the smaller end some lenders treat the scheme as a refurbishment bridge instead, which can be cheaper, and we will tell you which suits.
Not all forms of Buy to Let, Commercial or Bridging loans are regulated by the Financial Conduct Authority.
Get a figure you can rely on
Until the calculator is live, the quickest way to size your facility is to send us the site price, the build cost and the expected sale values. We will run the numbers the way the lender’s underwriter will, and because we go direct to lenders it is that underwriter we put the case to. Andrew has been in finance since 1989 and the first conversation is free. Call us, or send the figures through our contact page, and we will come back with a facility size and the money you would need to put in.