Development Finance Rates 2026

What sets the rate on a development loan and why the headline figure is the wrong thing to compare

Development finance rates are quoted as a monthly figure by most lenders and rolled up, so nothing is paid until the scheme sells or refinances. The rate a lender offers depends on how much of the end value you are borrowing, your track record, whether the site has full planning, how the units will be sold and where the scheme is. Two lenders looking at the same scheme in 2026 can quote rates some way apart and still cost you about the same once fees are added, which is why we compare the total cost of a facility and not the rate on its own. We have not printed a rate here because a figure that is true for one scheme is wrong for the next.

How the interest on a development loan is charged

Interest is charged on what has been drawn, from the day it is drawn. The site tranche runs from completion of the purchase, and each build drawdown starts to cost you the day the monitoring surveyor signs it off. Because it rolls up, the interest is added to the balance each month and the next month’s interest is charged on the larger figure, so the true annual cost is a little more than twelve times the monthly rate.

A minority of lenders will let you service the interest monthly, which keeps the facility smaller and can help a scheme that is tight against the lender’s ceiling. Our development finance page covers how the facility is structured.

What moves the rate on your scheme

The biggest lever is loan to GDV, the whole facility as a share of the end value. A facility that sits at 55% of the end value is priced lower than one pushing 70%, because the lender has more room if the sale prices come in short. Putting more of your own money into the site, or bringing in an equity partner, is the surest way to a lower rate.

After that, your track record. A developer who has finished three schemes and sold them is a different proposition to someone on their first, and lenders say so in the rate. On a first scheme a strong team narrows the gap: a project manager, and a builder who has done this kind of work before.

Planning is priced because the lender is carrying the risk that the scheme never gets built. Full consent with conditions discharged is the cheapest position. Outline consent, or a scheme that relies on a variation still to be granted, costs more, and some lenders will not look at it until consent is in.

Then the exit, which is how the loan gets repaid. Pre-sold or pre-let units bring the rate down. A scheme that will be refinanced onto a term mortgage is priced on whether that refinance is realistic on the day. Where the plan is to refinance onto a cheaper facility once the units are wind and watertight, development exit finance is the product, and pricing it in from the start changes the sum.

Then the smaller levers: location, the type of build (a conversion is usually priced below a ground-up scheme), the size of the facility and the kind of lender. The types of lender and what each is good for are on our development finance lenders page.

The rate is only part of the price

Every development facility carries an arrangement fee, and many carry an exit fee, which some lenders charge as a percentage of the loan and others as a percentage of GDV. A lender with a low monthly rate and an exit fee on GDV can cost more than a lender with a higher rate and no exit fee. Non-utilisation fees on undrawn build money, minimum interest periods and the cost of an extension if the scheme runs late all belong in the same comparison. Every one of those lines is described on our development finance costs page.

A worked example: two offers on the same scheme

This is an example, not a client, and the rates and fees in it are illustrative. Say a scheme has a GDV of £1,400,000 and needs a net facility of £800,000 over twelve months, with an average drawn balance of £500,000 across the term because the build money is released in stages.

Offer A Offer B
Monthly rate 0.85% 1%
Interest on £500,000 average balance for 12 months £51,000 £60,000
Arrangement fee 2% of £800,000 = £16,000 1.5% of £800,000 = £12,000
Exit fee 1% of £1,400,000 GDV = £14,000 none
Total cost of the facility £81,000 £72,000

Offer A has the lower rate. Offer B costs £9,000 less. Run the loan longer and the gap narrows, because A’s interest saving grows every month while its exit fee does not move. We run that comparison on every offer before recommending one. A version of this sum for your own figures is on our development finance calculator page.

Questions people ask about development finance rates

Are development finance rates fixed or variable?

Most are fixed for the term, quoted monthly. Some bank facilities are priced as a margin over the Bank of England base rate and move with it, which can be cheaper when rates fall and painful when they rise on a scheme that is already late.

Is development finance more expensive than a bridging loan?

For a straightforward site it is often similar, and for a scheme that needs staged drawdowns it is usually cheaper than trying to fund the build on a bridge, because you only pay interest on what has been released. For a light refurbishment that will be finished in a few months, a refurbishment bridge is the cheaper tool.

Does the rate come down for a second scheme?

Usually. Once you have completed a scheme and sold it, lenders who would not look at you as a first-time developer will, and the ones who did will price the next one lower. We keep the file from the first scheme so the second application is quicker.

Not all forms of Buy to Let, Commercial or Bridging loans are regulated by the Financial Conduct Authority.

Talk to us about the rate you could get

Tell us the site price, the build cost, the expected sale values and where the scheme stands on planning. We will come back with what the lenders we go direct to would charge and, more usefully, what each facility costs in total once the fees are in. The first conversation is free, and it is with Andrew, who has been in finance since 1989. Call us, or use our contact page.